Projects

Total Budget
Rp 2.199.182.761
Total Expenditure
Rp 2.135.408.761
Remaining Budget
Rp 63.774.000
Priority
Types
PIC
Project Filter
Reset
132 projects found
Project Milestone Last Activity Goals Type Status Priority Rank Responsible Duration Expenditure Budget Remaining
Analyze Desain Timeline Budget Procure Dev Trial Doc Launch Last Update Activity PIC
SPRAY LUBRIKATING PISAU ATAP
- - - - - - - -
-
- Quality Automation Open Expansion Given Priority
1
ANTON - Rp 2.187.673 Rp 2.187.673 -
ADJUSTER SOIL LIFTER 10T
- - - - - - - - - -
-
- Quality Automation Open Expansion Given Priority
2
ANTON - - - -
KERETA TRANSFER BARANG JADI GD14 KE GD 17
- - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Given Priority
3
ANTON - Rp 12.109.400 Rp 12.109.400 -
ALAT UJI JAHITAN HOLLOW
- - - - - - - - - -
-
- Quality Electric/Electrical Open Expansion Given Priority
4
ANTON - Rp 383.783 Rp 383.783 -
PLATING
- - - - - - - - - -
-
- Efficiency Product Test Close Finish Given Priority
5
YUSUF - Rp 2.504.500 Rp 2.504.500 -
ATAP PU
- - - - - - - - -
-
- Efficiency Product Open Expansion Given Priority
6
GUGUK - Rp 17.786.500 Rp 17.786.500 -
ALOKASI MESIN GUDANG 8 SEKAR ABANG
- - - - - - - - - -
-
- Effectiveness Mechanic Close Finish Given Priority
7
ANTON - Rp 68.400.000 Rp 68.400.000 -
AUTO LOW SPEED END COIL HOLLOW202607026
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Given Priority
8
YUSUF - - - -
AUTO SHUTDOWN MESIN
- - - - - - - - -
-
- Efficiency Mechanic Open Expansion Given Priority
9
YUSUF - - - -
METAL GARDEN
- - - - - - - - - -
-
- Effectiveness Product Close Finish Given Priority
10
GUGUK - Rp 8.308.500 Rp 8.308.500 -
BASE PLAT HOLLOW SIGMA
- - - - - - - - - -
-
- Quality Product Open Research Given Priority
11
GUGUK - Rp 20.000.000 Rp 20.000.000 -
PANEL SDP MESIN ROCKY AUTO LINE-02
- - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Given Priority
12
YUSUF - - - -
BELAH DECOILER MANUAL DOUBLE
- - - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Given Priority
13
DAVI - Rp 12.000.000 Rp 12.000.000 -
CHILLER UPVC
- - - - - - - - - -
-
- Environment Mechanic Open Research Given Priority
14
DAVI - - - -
COIL MEGAZINE
- - - - - - - - -
-
- Environment Mechanic Open Research Given Priority
15
DAVI - - - -
COUNTER HITUNG PRODUCK RCK-03
- - - - - - - - - -
-
- Effectiveness Mechanic Close Finish Given Priority
16
ANTON - Rp 61.250.000 Rp 61.250.000 -
PRODUK ZINERGIUM
- - - - - - - - -
-
- Quality Product Close Finish Given Priority
16
ANTON - Rp 264.785.000 Rp 264.785.000 -
PANEL DINDING 50 × 50
- - - - - - - - - -
-
- Quality Product Open Expansion Given Priority
17
YUSUF - - - -
EVAPORATOR MESIN PIPA DIRTY TANK
- - - - - - - - -
-
- Environment Electric/Electrical Open Research Scheduled
17
DAVI - Rp 240.000.000 Rp 240.000.000 -
MESIN DRAT TIE ROD
- - - - - - - - - -
-
- Quality Product Open Expansion Given Priority
17
GUGUK - Rp 4.351.351 Rp 4.351.351 -
UPVC BOLTLESS
- - - - - - - - - -
-
- Quality Product Open Expansion Given Priority
17
GUGUK - - - -
MATRIS EMBOS KENCANA PRODUK TRIMLOCK
- - - - - - - - -
-
- Environment Mechanic Close Finish Given Priority
18
ANTON - Rp 21.215.000 Rp 21.215.000 -
PEMBUATAN PAGAR
- - - - - - - - - -
-
- Quality Automation Close Finish Given Priority
18
ANTON - Rp 8.000.000 Rp 8.000.000 -
PISAU MESIN ECOCLIP
- - - - - - - - -
-
- Efficiency Operational Close Hold Given Priority
18
ANTON - Rp 23.700.000 Rp 23.700.000 -
SELF FAULT DETECTION
- - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
18
ANTON - - - -
PISAU MESIN DAUN PINTU 20MM
- - - - - - - - -
-
- Efficiency Mechanic Open Expansion Given Priority
18
ANTON - Rp 1.203.500 Rp 1.203.500 -
MODIF SHAFT PELURUS DEPAN MESIN KANAL
- - - - - - - - -
-
- Quality Automation Open Expansion Given Priority
18
YUSUF - - - -
FILTRASI OLI
- - - - - - - - -
-
- Efficiency Mechanic Open Research Scheduled
18
DAVI - - - -
UPGRADE MESIN EMBOS ROLL ATAP
- - - - - - - - -
-
- Effectiveness Automation Open Expansion Given Priority
19
ANTON - Rp 10.465.000 Rp 10.465.000 -
RFID COIL
- - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
19
ANTON - - - -
PANEL SDP GD 8 SEKAR ABANG
- - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
19
ANTON - - - -
MATRIS EMBOS ZINERGIUM KR5
- - - - - - - - -
-
- Quality Product Open Expansion Given Priority
19
ANTON - - - -
DUST COLLECTOR RCK 3
- - - - - - - - - -
-
- Efficiency Mechanic Close Finish Scheduled
19
DAVI - Rp 38.500.000 Rp 38.500.000 -
FLOOR PANEL
- - - - - - - - -
-
- Quality Product Open Expansion Given Priority
19
GUGUK - Rp 23.800.000 Rp 23.800.000 -
PISAU MESIN ECOTRIM
- - - - - - - - -
-
- Efficiency Mechanic Close Hold Scheduled
20
ANTON - Rp 15.000.000 Rp 15.000.000 -
ELECTRO PLATTING
- - - - - - - - -
-
- Quality Product Close Finish Scheduled
20
YUSUF - Rp 96.000.000 Rp 96.000.000 -
PENAMBAHAN MESIN ROCKY LINE PART
- - - - - - - - - -
-
- Effectiveness Electric/Electrical Close Hold Scheduled
20
YUSUF - Rp 2.659.000 Rp 2.659.000 -
MATRIS STAMPING EMSOS ZINERGIUM SHEET
- - - - - - - - -
-
- Quality Product Close Finish Scheduled
20
DAVI - Rp 99.000.000 Rp 99.000.000 -
FLORA ECOTRIM
- - - - - - - - - -
-
- Quality Product Open Expansion Given Priority
20
GUGUK - - - -
MESIN NOK MANUAL CADANGAN
- - - - - - - - -
-
- Efficiency Electric/Electrical Close Finish Given Priority
21
ANTON - - - -
PENAMBAHAN RUBBER KARET DECOILER MANUAL
- - - - - - - - - -
-
- Efficiency Mechanic Open Expansion Scheduled
21
ANTON - Rp 18.000.000 Rp 18.000.000 -
PAN MIXER ROCKY
- - - - - - - - - -
-
- Environment Automation Open Expansion Given Priority
21
ANTON - Rp 7.000.000 Rp 7.000.000 -
FOOTPLATE ELEVATOR
- - - - - - - - - -
-
- Quality Mechanic Close Finish Scheduled
21
TASYA - Rp 2.541.000 Rp 2.541.000 -
INTEGRATED MAINTENANCE (DATA LOGGER)
- - - - - - - - -
-
- Effectiveness Automation Open Expansion Given Priority
21
YUSUF - - - -
SOFT START - STOP DECOILER AUTO
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
21
YUSUF - - - -
ECOBOLT
- - - - - - - - -
-
- Quality Product Open Expansion Scheduled
21
GUGUK - - - -
UPGRADE MOTOR MESIN ECOTRIM
- - - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
22
ANTON - - - -
STOPPER MANUAL TRUSS
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
22
YUSUF - - - -
SPLITTER ENCODER
- - - - - - - - -
-
- Quality Mechanic Open Research Scheduled
22
YUSUF - - - -
OVEN PASIR ROCKY
- - - - - - - - -
-
- Efficiency Mechanic Close Finish Scheduled
22
DAVI - Rp 25.828.340 Rp 25.828.340 -
DONGKRAK HIDROLIS
- - - - - - - - -
-
- Effectiveness Electric/Electrical Close Finish Given Priority
23
ANTON - - - -
MODUL SETTING
- - - - - - - - -
-
- Effectiveness Automation Open Expansion Scheduled
23
ANTON - Rp 41.900.000 Rp 41.900.000 -
TUNGKU PEMBAKARAN LIMBAH PRODUKSI ROCKY
- - - - - - - - - -
-
- Efficiency Electric/Electrical Open Expansion Scheduled
23
ANTON - Rp 83.000 Rp 83.000 -
PROTEKSI RELAY KUBIKEL GG
- - - - - - - - -
-
- Efficiency Product Open Expansion Given Priority
23
YUSUF - - - -
ROLL GRAVITY
- - - - - - - - -
-
- Quality Mechanic Open Expansion Given Priority
23
YUSUF - - - -
ROLL PELURUS COIL EDGE WAVE ATAP
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
23
YUSUF - - - -
FORKLIFT FORK ADJUSTER
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
23
DAVI - - - -
STAND OUTPUT ATAP
- - - - - - - - - -
-
- Quality Electric/Electrical Open Expansion Scheduled
24
ANTON - - - -
PROGRAM LAV
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
24
TASYA - - - -
ROLL EMBOS MESIN RENG TH45
- - - - - - - - - -
-
- Quality Product Close Finish Given Priority
24
DAVI - Rp 12.815.000 Rp 12.815.000 -
GENTENG HORIZONTAL
- - - - - - - - -
-
- Quality Product Open Expansion Scheduled
24
GUGUK - - - -
MATRAS PANEL ATAP HEXA
- - - - - - - -
-
- Efficiency Mechanic Close Hold Scheduled
25
ANTON - - - -
HOLLOW GALVANIS 50 x 100
- - - - - - - - - -
-
- Quality Product Test Open Expansion Scheduled
25
TASYA - Rp 12.100.000 Rp 12.100.000 -
MATRAS LUBANG KABEL TRAY
- - - - - - - - -
-
- Quality Mechanic Open Research Scheduled
25
TASYA - Rp 58.800.000 Rp 58.800.000 -
ECOCLIP 982
- - - - - - - - -
-
- Quality Product Open Expansion Given Priority
25
GUGUK - Rp 36.100.000 Rp 36.100.000 -
HOLLOW GALVANIS 50 × 50
- - - - - - - - - -
-
- Quality Product Open Expansion Given Priority
26
GUGUK - - - -
MODIFIKASI DECOILER MANUAL TRUSS
- - - - - - - - -
-
- Efficiency Automation Open Expansion Given Priority
50
ANTON - Rp 17.000.000 Rp 17.000.000 -
MODIFIKASI GIGI HOLDER
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
51
TASYA - Rp 1.200.000 Rp 1.200.000 -
MODIFIKASI KANALUM C120
- - - - - - - - - -
-
- Quality Mechanic Close Finish Scheduled
52
DAVI - Rp 383.400 Rp 383.400 -
MODIFIKASI KANALUM C125
- - - - - - - - - -
-
- Efficiency Mechanic Close Finish Given Priority
53
DAVI - Rp 161.820.000 Rp 161.820.000 -
MODIFIKASI MATRAS EMBOS SEMANGGI
- - - - - - - - -
-
- Efficiency Mechanic Close Finish Scheduled
54
DAVI - Rp 8.500.000 Rp 8.500.000 -
MODIFIKASI MOTOR HIDROLIS SPIN TUNGGAL KE BINTANG
- - - - - - - - -
-
- Efficiency Mechanic Open Expansion Given Priority
55
ANTON - - - -
MODIFIKASI PANGKON PISAU MESIN TRUSS
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
56
DAVI - - - -
MODIFIKASI PANGKON PISAU MESIN TRUSS
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
57
- - - - -
MODIFIKASI PISAU CANALUM
- - - - - - - - -
-
- Efficiency Product Close Finish Given Priority
58
DAVI - Rp 24.450.000 Rp 24.450.000 -
MODIFIKASI ROLL PELURUS MESIN RENG CHINA
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
59
DAVI - - - -
MODIFIKASI ROLL PELURUS MESIN RENG TH45
- - - - - - - - -
-
- Efficiency Product Test Close Finish Scheduled
60
DAVI - Rp 60.000.000 Rp 60.000.000 -
MODIFIKASI ROLL SETTING KANALUM
- - - - - - - - -
-
- Effectiveness Automation Close Finish Given Priority
61
TASYA - Rp 1.577.186 Rp 1.577.186 -
MODIFIKASI RUMAH PISAU MESIN TRUSS
- - - - - - - - -
-
- Effectiveness Automation Open Expansion Scheduled
62
DAVI - Rp 41.900.000 Rp 41.900.000 -
MODULE SETTING MESIN PIPA STS&STV
- - - - - - - - - -
-
- Quality Automation Open Expansion Given Priority
64
ANTON - - - -
SAFETY CRANE
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
97
DAVI - - - -
SAFETY KUBIKEL BALONG MOJO
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
98
DAVI - - - -
MINI HOIST
- - - - - - - - -
-
- Effectiveness Mechanic Close Finish Scheduled
-
ANTON - - - -
JALUR PIPA COMPRESSOR ROCKY LINE 04
- - - - - - - - - -
-
- Effectiveness Mechanic Close Finish Scheduled
-
ANTON - Rp 163.218.000 Rp 163.218.000 -
MATRAS MESIN FIXING STREP STEP - 01
- - - - - - - - -
-
- Efficiency Mechanic Close Finish Scheduled
-
ANTON - Rp 34.500.000 Rp 34.500.000 -
PURIFIKASI CUTTING OIL
- - - - - - - - -
-
- Efficiency Mechanic Close Finish Scheduled
-
ANTON - Rp 82.400.000 Rp 82.400.000 -
MAL PRODUK
- - - - - - - - -
-
- Efficiency Product Close Finish Scheduled
-
ANTON - Rp 54.000.000 Rp 54.000.000 -
WEATHER SHIELD ECOCLIP
- - - - - - - - - -
-
- Efficiency Product Test Close Finish Scheduled
-
ANTON - - - -
MATRIS STAMP EMBOS KR5
- - - - - - - - -
-
- Quality Product Open Expansion Scheduled
-
ANTON - Rp 5.000.000 Rp 5.000.000 -
ROLL PENYIKU PROFIL PENGUNCI MESIN ATAP
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
ANTON - - - -
SMART VEHICLE TRAKING SISTEM
- - - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
-
YUSUF - - - -
ROLL ENCODER KARET (GG)
- - - - - - - - -
-
- Efficiency Product Test Close Finish Scheduled
-
DAVI - - - -
UPGRADE SENSOR POTONG
- - - - - - - - - -
-
- Effectiveness Automation Open Expansion Scheduled
-
DAVI - Rp 41.900.000 Rp 41.900.000 -
UPGRADE PANEL CONTROL MESIN TRUSS
- - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
-
DAVI - - - -
UPGRADE PANEL CONTROL LONG CRANE
- - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
-
DAVI - - - -
UPGRADE CONTROL PANEL HOLLOW
- - - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
-
DAVI - Rp 41.900.000 Rp 41.900.000 -
TOMBOL MANUAL PRINT TRUST HOLLOW
- - - - - - - - -
-
- Effectiveness Electric/Electrical Open Expansion Scheduled
-
DAVI - - - -
UPGRADE PANEL DECOILER AUTO
- - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
-
DAVI - - - -
SCISSORS LIFT TABLE
- - - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
-
DAVI - - - -
SMART VEHICLE TRAKING SISTEM
- - - - - - - - - -
-
- Effectiveness Mechanic Open Expansion Scheduled
-
DAVI - - - -
STANDARISASI PISAU MESIN KANAL C80
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
UPSPEED MESIN ATAP
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
PENAMBAHAN SENSOR UNTUK AKHIRAN HOLLOW
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
PENAMBAHAN PENGGANTIAN HOLDER HOLLOW
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - Rp 905.000 Rp 905.000 -
STORAGE COIL
- - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
PENAMBAHAN TOMBOL EMERGENCY TRUSS
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
UJI KANALUM
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
DAVI - - - -
UJI UPVC
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
-
DAVI - - - -
STACKER
- - - - - - - - -
-
- Effectiveness Automation Open Research Scheduled
-
DAVI - - - -
TANKI OLI HIDROLIS MINI
- - - - - - - - -
-
- Efficiency Mechanic Open Research Scheduled
-
DAVI - - - -
PEMASANGAN KIPAS BLOWER GUDANG 17
- - - - - - - - - -
-
- Environment Mechanic Open Research Scheduled
-
DAVI - - - -
MATRAS LUBANG AIRCLAD
- - - - - - - - -
-
- Efficiency Mechanic Open Research Given Priority
-
DAVI - - - -
MATRIS EMBOS KENCANA MESIN KR5 (CHINA)
- - - - - - - - -
-
- Quality Product Test Open Research Scheduled
-
DAVI - - - -
MODIF MESIN EMBOS MESIN DAUN PINTU KAYU
- - - - - - - - -
-
- Quality Mechanic Open Research Scheduled
-
DAVI - - - -
PENGGANTIAN SPACER ENCODER
- - - - - - - - - -
-
- Quality Automation Open Research Given Priority
-
DAVI - - - -
RUBBER FORKLIFT FORK
- - - - - - - - -
-
- Safety Mechanic Open Research Scheduled
-
DAVI - Rp 54.800.000 Rp 54.800.000 -
MATRIS EMBOS ZINERGIUM ECOCLIP
- - - - - - - - -
-
- Efficiency Product Close Finish Scheduled
-
GUGUK - - - -
MATRIS EMBOS KENCANA MESIN ECOCLIP
- - - - - - - -
-
- Quality Product Close Finish Scheduled
-
GUGUK - Rp 4.039.828 Rp 4.039.828 -
MESIN LOUVRE
- - - - - - - - -
-
- Quality Product Close Finish Scheduled
-
GUGUK - Rp 63.774.000 Rp 127.548.000 Rp 63.774.000
SPIRAL DUCTING
- - - - - - - - -
-
- Quality Product Open Expansion Scheduled
-
GUGUK - - - -
WALL PANEL
- - - - - - - - -
-
- Quality Product Open Expansion Scheduled
-
GUGUK - - - -
MODIF DIES GENTENG
- - - - - - - - - -
-
- Quality Product Open Expansion Scheduled
-
GUGUK - Rp 2.925.000 Rp 2.925.000 -
TALI AIR DINDING
- - - - - - - - -
-
- Quality Product Open Research Scheduled
-
GUGUK - - - -
WATER FORTEX RCK 2
- - - - - - - - -
-
- Environment Mechanic Open Expansion Scheduled
-
KHAMIM - Rp 439.800 Rp 439.800 -
PROJECT UJI SAMBUNGAN ECOCLIP
- - - - - - - - - -
-
- Efficiency Product Open Research Given Priority
-
- - - - -
PEMASANGAN KIPAS BLOWER GUDANG 17
- - - - - - - - - -
-
- Environment Mechanic Open Research Scheduled
-
- - - - -
FOOTPLATE ELEVATOR
- - - - - - - - - -
-
- Quality Mechanic Close Finish Scheduled
-
- - - - -
ROLL PELURUS COIL EDGE WAVE ATAP
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
- - - - -
UPSPEED MESIN ATAP
- - - - - - - - - -
-
- Quality Mechanic Open Expansion Scheduled
-
- - - - -
PEMBUATAN PAGAR
- - - - - - - - - -
-
- Quality Automation Close Finish Scheduled
-
- - - - -
UJI UPVC
- - - - - - - - - -
-
- Quality Automation Open Expansion Scheduled
-
- - - - -
INDIKATOR ALARM QC
- - - - - - - - - -
-
- Quality Mechanic Open Research
-
- - - - -